About the project

A standout project demonstrating speed, precision, and high-quality execution - Dijk 59 is a prime example of STM Design & Build’s ability to deliver exceptional results under tight deadlines.

STM Design & Build successfully transformed an initial 2D concept into a fully realized restaurant with terraces and a playground. Despite limited time and challenges, the project was executed with a turn-key approach, leveraging advanced 3D modeling to enhance efficiency, collaboration, and overall quality.

Project highlights
Full-service execution from design to completion
Optimized collaboration with a unified construction team
Efficient 3D modeling to streamline construction
High-quality insulation and energy-efficient materials
Turnkey delivery completed within just 18 weeks
No items found.
1/3
The four project pillars

Full-service care

From initial concept to final execution, STM Design & Build took complete responsibility for the project. The architectural and structural designs were developed in-house with iDB. The steel construction was produced at STAWI, while STM handled the foundation, structure, wall and roof cladding, as well as aluminium doors and windows.

Process-focused design

Despite a tight schedule and various challenges, STM’s expert team successfully delivered the project on time. Utilizing a 3D construction model significantly reduced construction time while enhancing quality and collaboration among all stakeholders.

Future-proof innovation

  • Ring Piling Foundation & Floor: Ensuring a stable and durable base for long-term structural integrity.
  • High-Quality Insulation Materials: Enhancing energy efficiency and ensuring indoor comfort.
  • Aluminium Windows & HR++ Glass: Providing excellent thermal insulation, reducing energy loss, and ensuring durability with minimal maintenance.

Trust & safety

Working closely with the customer and Klaver, STM operated as a unified construction team. This collaborative approach allowed for fast, high-quality decision-making, ensuring that the project was completed efficiently and within budget.

No items found.
1/3
Facts & figures

The project presented unique challenges, including limited initial information and a tight timeline. With quick adaptation, STM translated 2D drawings into a full 3D architectural model within a week, providing a complete turn-key quotation in just two weeks. Execution began only one week after approval, allowing for rapid foundation work and completion within 18 weeks.

Below is a detailed overview of all specifications and special features of this project.

  • Project name: Dijk 59, Losser
  • Address: Denekamperdijk 59, 7581 PX Losser, Netherlands
  • Completion date: 29.04.2019
  • Lead time: 18 weeks
  • Foundation: Ring piling foundation
  • Prefab insulated construction
  • Energy management solutions
  • Advanced BIM integration
  • 3D modeling and architectural design
  • High-quality insulation materials
  • Aluminium windows and HR++ glass
  • Entire project completed in just 18 weeks
  • Rapid transition from 2D drawings to full 3D architectural modeling
  • Turnkey delivery with minimal delays
  • Optimized workflow and collaboration across teams
No items found.
1/3
Contact us
Rene Bos

Ready to forge your future?

Explore our open positions and find your place in a team that’s shaping the future of our industry.

Projects

Have a look at past projects we’ve forged futures for already